01 |
Construction Of Car Parking Lots And Roads On a Call Off Basis For 3 Years
|
The work consists of earthworks including excavation grading works, filling works & embankment works, laying & compaction of subbase, different pavement courses, road marking, traffic signs, kerb works, paving interlocks, surface water drainage works, Security barrier installation, security bollard works, security guard rooms, fencing works, street lighting, water tanks installation.
|
Qatar Foundation
|
Al Rayyan, QF
|
02 |
Road Improvement Works In Rayyan Areas-Phase 5B Contract C 2018/119- Ia 2018 C 020 I
|
The project works located in various part of Rayyan and Gharrafa areas within the boundary of Qatar Zones 51 to 55, 80 & 81 of Rayyan Municipality and Western Areas of Qatar. The works comprise the construction of temporary/permanent access roads for social benefits of the residents and contribute economic development in the area in line with RPD programme.
The works consist of Site Clearances, Earthworks, Unbound Pavement, Asphalt Works, Kerbing and Footways, Traffic Signs and Road Markings, Necessary Ducts for Water Services Connection/Electricity/Ooredoo, Road Lightings and Road Drainage.
|
Ashghal
|
Rayyan Areas
|
03 |
Highway & Reinstatement At Al Sudan, Al Waab, Sports City & National Museum Of Qatar,Ras Bu Aboud Stations
|
The project consists of the Construction of Highway & Station Area Works ( hardscaping, Landscaping, Electrical & Drainage Works) in and around the newly built Qatar Rail Stations.
|
QRail/ ALYSJV
|
QRail-Gold Line Stations
|
04 |
Site Grading & Associated Works For Doha Depot Expansion Project TC /03/01/12)
|
The works consist of the clearing of site,back fill to subgrade level with selected excavated back fill etc., Laying of sub base & Laying of different pavement courses, install Interlocks,kerbs related works and traffic signs, road marking for the roads(Approximate area:100,000m²)
|
Qatar Fuel Woqod
|
Abu Hamour
|
05 |
Road Works For Energy Centre Project, Khalifa Stadium.
|
The works carry the site clearance, laying, and compaction of different pavement courses for new road construction, inside QP Raslaffan
|
Aspire Zone
|
Khalifa Stadium
|
06 |
Reinstatement Works In Roadways & Pavements At Various Locations.( GTC 565/2013
|
Road diversion & Site layout as per “Work Zone Traffic Management Guide”.
Construction of kerbs and footways.
Road Reinstatement works on Major & Minor Roads. Pedestrian Areas Reinstatement Works, Concrete Protection & Backfilling for existing pipes Including installation of Kerbstone, Paving Blocks Concrete Slab, Bollards, Marble, Decorative Tiles, vehicle Barriers, Landscaping work. Design and construction of temporary pedestrian crossings.Provision of barricades, barriers, road signs, and warning lamps.
Road marking, Fencing and related safety measures.
The work also included all necessary survey and investigation to evaluate the condition of all existing roads. Milling and resurfacing of existing roads, construction of new soak away and road gullies with DI covers and gratings.
|
Kahraama
|
All Throughout Qatar
|
07 |
Asphalting Of Truck Parking Area At
|
The works carries the site clearance, excavation, backfilling and compaction of subgrade, laying and compaction of subbase, laying and compaction of different pavement courses for new road construction, road marking & road signs to ensure the safe movement of both vehicular and pedestrain
|
Qatar Chemical Company Limited (QCHEM)
|
QCHEM- Mesaieed
|
08 |
Resurfacing Of Roads In NGL 1/2/3/4 Plants At Gas Operations, Mesaieed
|
The works carries construction of new access road to the flare area, resurfacing works at NGL Plants which consists of removal of existing asphalt road by cold planning, laying and compaction of different pavement courses, installation of kerbs, concrete slabs, painting of kerbs, road marking & road signs
|
Qatar Petroleum
|
NGL 1,2,3 Qp Mesaieed
|
09 |
Emergency Reinstatement Of Roads - Contract 2/2015( Aa Rom 2015 040 C2 G)
|
The work generally comprises an emergency reinstatement and maintenance works of general nature to ensure the safe movement of both vehicular and pedestrain traffic on all roads throughout the state of Qatar.
|
Ashghal
|
All Throughout Qatar
|
10 |
Maintenance Of Roads With In Doha Municipality Area (Rm 1103)
|
The work generally comprises an emergency reinstatement and maintenance works of general nature to ensure the safe movement of both vehicular and pedestrain traffic on all roads throughout Doha
|
Ministry Of Muncipality & Urban Planning
|
Doha Municipality
|
11 |
Maintenance Of Roads With In Doha Municipality Area (RM 1102)
|
The works consist of the various types of repairs and maintenance works to existing roads,for pavement layers,street lighting,traffic signs road marking for all roads within the Doha municipality area to ensure the safe movement of both vehicular and pedestrain.
|
Ministry Of Muncipality & Urban Planning
|
Doha Municipality
|
12 |
Maintenance Of Roads With In Doha Municipality Area (RM 1083)
|
The work generally comprises an emergency reinstatement and maintenance works of general nature to ensure the safe movement of both vehicular and pedestrain traffic on all roads throughout Doha
|
Ministry Of Muncipality & Agriculture (Doha Municipality)
|
Doha Municipality
|
13 |
Road Works At Construction Of Workers Hospita & Integrated Health Centre L At Mesaied Industrial Area
|
The works carries the site clearance, excavation, backfilling and compaction of subgrade, laying and compaction of subbase, laying and compaction of different pavement courses for new road construction, road marking & road signs to ensure the safe movement of both vehicular and pedestrain
|
Private Engineering Office
|
Mesaieed
|
14 |
Construction Of Roads & Infrastructure At Umm Al Houl (Qez-03)
|
The works carries the site clearance, excavation, backfilling and compaction of subgrade, laying and compaction of subbase, laying and compaction of different pavement courses for new road construction, road marking & road signs to ensure the safe movement of both vehicular and pedestrain
|
Manateq
|
Umm Al Houl
|
15 |
Road Works At Proposed Bus & Car Parking –Shell Raslaffan
|
The works carries the site clearance, excavation, backfilling and compaction of subgrade, laying and compaction of subbase, laying and compaction of different pavement courses for new road construction, road marking & road signs to ensure the safe movement of both vehicular and pedestrain
|
Shell
|
Raslaffan
|
16 |
Road Works At Oryx GTL New Warehouse Project (MOC-601)
|
The works carries the site clearance, excavation, backfilling and compaction of subgrade, laying and compaction of subbase, laying and compaction of different pavement courses for new road construction, road marking & road signs to ensure the safe movement of both vehicular and pedestrain
|
Oryx GTL
|
Raslaffan
|
17 |
Supply & Application Of Asphalt For Park And Ride Access Roads At Al Bayt Stadium
|
The works carries the site clearance, excavation, backfilling and compaction of subgrade, laying and compaction of subbase, laying and compaction of different pavement courses for new road construction, road marking & road signs to ensure the safe movement of both vehicular and pedestrain
|
Aspire Zone
|
Al Khor
|
18 |
Road Works For Energy Centre Project, Khalifa Stadium.
|
The works carries the site clearance, excavation, backfilling and compaction of subgrade, laying and compaction of subbase, laying and compaction of different pavement courses for new road construction,
road marking & road signs to ensure the safe movement of both vehicular and pedestrain.
|
Aspire Zone
|
Khalifa Stadium
|
19 |
Parking Area & Shades At Al Jazeera Net Work (GTC 198/2008R1)
|
The work carries the Site clearance, excavation, backfilling and compaction,
Laying of sub base & Laying of different pavement courses
|
Al Jazeera Satellite Network
|
Doha Municipality
|
20 |
Engineering, Procurement & Construction Of Minor Asphalt Access Road Between XK-30 & FOC -4
|
The work comprise the Detailed Survey, Engineering for road construction,
setting out, right of wayThe proposed new road pavements have been constructed as per RasGas standard and being designed to a maximum
speed of 60 KPH. The box -culvert have been constructed at V-ditch crossing and this structure will act as bridge for vehicles travelling
across the V-ditch. Concrete barrier of 1m high minimum to protect existing steel pipe rack support structure where the new road is passing underneath;
Provision of road markings,traffic signs and humps with standard specification.
|
Rasgas Company Ltd
|
Rasgas, Raslaffan
|